Week 19: (January 23rd 2000)
I have not been doing much with the car these past few weeks. I put the engine and transmission together this weekend and then I installed the assembly in the frame. Included in these pictures are items I did over the past few weeks that I didn't photograph as I was doing them. (I forgot to take the camera to the workshop)
Engine & transmission Installed - Note the water pump and fan clutch has been installed as well as the elbow for the radiator hose:


Shot of Alloy valve cover, blank plate over fuel pump hole. I have yet to install the alternator or starter.


Shot of overdrive transmission with new wiring harness.

New overdrive cut-off switch:


Nice shiny new calipers:

