Week 7: November 18th 2000


Body Work:

It’s going very slowly and here is the body work done so far:

Here is the battery tray & windscreen wiper motor assembly being built on the left side:

Old cylinder holes filled:

Luggage rack holes filled:

Second power antenna hole filled:

Interior shot of the left hand bulkhead: